← All machines
Robotic barn · head to head

Astronaut Max vs Juno

Two robotic barn machines, one verified table. Every figure below is sourced and dated; vendor claims are labelled and kept apart from independent results.

Astronaut Max in full →Juno in full →Open in the comparator →
Lely · Netherlands

Centralised milking architecture for large herds (announced August 2025) — up to 18 Astronaut robots share one control room for vacuum, cleaning, cooling and long-distance milk transport.

Best for: Dairy farms of 500–1,100 cows wanting robot milking without one full utility set per box.
Lely · Netherlands

Lely's battery-electric automatic feed pusher — follows pre-installed floor strips with ultrasound distance sensing to push feed to the fence up to 48 times a day, returning to its charging station between runs. Current line is Juno / Juno Flex; the lidar-navigating Juno Max for 800+ cow farms was unveiled September 2024 with commercial launch expected 2027. Swiss sales and service via Lely Center Härkingen.

Best for: Any dairy or beef barn with a feed alley — frequent pushing raises intake day and night for a modest, low-maintenance robot.
Astronaut Max
Verified 2026-07-16
Juno
Verified 2026-07-16
Overview
TaskRobotic barnRobotic barn
AutonomyFully autonomousFully autonomous
Country of originNetherlandsNetherlands
AvailabilityPilot / limitedAvailable now
EU marketCE-markedCE-marked
Lead timeNot disclosedNot disclosed
Last verified2026-07-162026-07-16
Specifications
Power sourceMains electric · centralised vacuum, cleaning and cooling unitsBattery-electric with docking/charging station
Required tractor powerNot applicableNot applicable
DimensionsCentral control room + in-barn robot boxes (layout-specific)Compact round pusher with rotating skirt
WeightFixed installationNot disclosed
Min farm size500 cowsAny herd with a feed alley
ProductivityUp to 18 connected Astronaut robots · 500–1,100 cowsFlexible schedule, up to 48 pushing runs per day
Max speedNot applicableNot disclosed
SensorsAstronaut robot sensor suite · centralised system monitoringUltrasound distance sensing to the feed fence · route via pre-installed floor strips (Juno Max — lidar, odometry, virtual farm map)
Price & model
Price (EUR)Not disclosedNot disclosed
Native priceNot disclosedNot disclosed
Business modelPhased commercial rollout from 2026; validation farms since 2023–2024Buy via regional Lely Center
Ongoing costService contract via Lely Center; consumables centralisedElectricity; battery life-cycle; service via Lely Center
Key outcome
Best verified result
No verified outcome
Dry matter intake
+3.5% · vendor
EU context
CE markingCE marking expected at commercial rollout; system in validationCE marked
Machinery RegulationTo conform with Regulation (EU) 2023/1230 at market placementCompliant — Regulation (EU) 2023/1230; Swiss market access via CH–EU Mutual Recognition Agreement
CAP subsidyLivestock-modernisation schemes typically apply; confirm per member state at rolloutEligible under rural-development livestock schemes

"—" means the manufacturer has not disclosed the figure; we never estimate silently. Model either machine's payback with your own numbers on its ROI calculator page.